Our process comes in three (3) stages. To identify, develop and deployed a set of maintenance strategies that will enable a piece of physical asset to reliably operate within its operating context over its whole of life. We will complete the steps required following our asset strategy review process
- Value Proposition
- Design & Evaluation
- Deployment
These three steps can be articulated as follows
First we identify and prioritise the value equipment models and its systems and subsystems and then formalise objectives and scope whether it be Safety, Volume or Cost. Then we design and evaluate the defined value proposition by using Reliability modelling scenarios and value driver tree evaluation. This is executed in the form of statistical analysis of component life utilising historical maintenance data. Finally we deploy a complete pack of maintenance strategies (PM Inspection & Component Life Strategies) designed and created from the assessment of design & evaluation. Set of maintenance tactics and practices that is operational ready to be planned, scheduled and ready for execution once uploaded to the desired CMMS.
Full details on our process is attached for your convenience to go through via the link below.